Construction of a second road crossing over the River Mersey commenced on October 2014 after years of discussion and planning dating back some 20 years.
The Mersey Gateway project will provide a second road crossing over the River Mersey, comprising of a 6 lane cable stayed bridge, providing 3 free flowing lanes in each direction.
The bridge will be connected to the national motorway network via a 9.5km section of express way which will be upgraded to provide a high quality link with the M56. Currently to reach the Silver Jubilee Bridge from the M56 drivers use the Weston Point Express Way, however when the new bridge opens drivers will use the Central Express Way which is being enhanced.
Both the new bridge and Silver Jubilee bridge will be tolled in order to help finance the Mersey Gateway project and pay towards operation and maintenance of the bridges. The toll has been set at £2 to cross the bridge for a one way trip for a car or small van, it is suggested that this will be in line with the cost to use the Mersey tunnels by 2017.
Both the new bridge and Silver Jubilee bridge will be tolled in order to help finance the Mersey Gateway project and pay towards operation and maintenance of the bridges. The toll has been set at £2 to cross the bridge for a one way trip for a car or small van, it is suggested that this will be in line with the cost to use the Mersey tunnels by 2017.
Unlike the Mersey tunnels the bridges will not have toll booths but will instead use an "open road tolling system" which will utilise smart technology to capture vehicle details. Regular users of the bridge will be able to register their vehicle in order to up to 10% on each trip
Key facts
Progress as of February 2015 on the Runcorn side of the Mersey
Progress as of February 2015 on the Widnes side of the Mersey
These images were captured from Wigg Island, a Local Nature Reserve on the Runcorn side of the Mersey. I couldn't resit capturing this framed shot of the works taking place on the Widnes side of the Mersey. as seen through one of the bird watching stands.
- Total length 2130 metres
- River Span 1000 metres
- Largest tower 125m high
- 6 traffic lanes (3 in each direction)
Economics
- Construction and land costs are estimated to be £600m
- The project will be 70% funded by the private sector
- £61.9 million a year in economic benefits from the new jobs by 2030
- Standard toll charge to use the bridge in 2017 has been set at £2 for a one-way trip.
Benefits
- 470 permanent full-time equivalent jobs on site during the construction
- 4,640 permanent new jobs as a result of the operation of the Mersey Gateway
- reductions in some journey times of up to 10 minutes in peak periods,
- increase in journey time reliability
- less congestion resulting in lower carbon emissions
Progress as of February 2015 on the Widnes side of the Mersey